Roads

Projects

Roads

Sr. No. Project Details Authority Project Cost
1 Rehabilitation and Up-gradation of Kannod-Satwas-Punasa section of SH-41 from Chainage Km. 0+000 to Km. 77+330 (Design length 77+320 km) to two lane with hard shoulder road with Cement Concrete pavement in the state of MP on EPC mode. MPRDC
Bhopal 
118.68 Cr.
2 Up-gradation of Kusumba to Malegaon section of Principally Approved NH from Ch: 55+000 Km to Ch: 96+410 Km (Design Ch: 54+155 Km to Ch: 95+500, Total Length 41.345 KM) to Two Lane with Paved Shoulder configuration (Package No. Nashik –II Dondaicha – Kusumba – Dongrale – Malegaon Road Approx. 96.00 Km) in the State Maharashtra– PACKAGE 2 (Nashik Division) in the state of Maharashtra on EPC mode. PWD NH
Mumbai
116.20 Cr.
3 Construction of 11.46 km C.C. Road in the Rewa City Portion from K.M. 229/2 TO 243/2 of old NH no 7 (MDR no 10-20) Under CRF. MP PWD
Rewa
107.36 Cr
4 Construction of Bituminous Overlay Works  between Km. 261+720 to Km. 379+878 in Dhule-Pimpalgaon Section of NH-3 the state of Maharashtra. IRCON-SOMA Tollway Pvt Ltd 86.85 Cr.
5 Construction of Four laning of Rau Pithampur road section from km.0.000 to km.13.826 on EPC Mode. AKVN
Indore
75.61 Cr.
6 Development Work at Scheme No. 136, Indore in the state of Madhya Pradesh. IDA
Indore
70.76 Cr.
7 IMPROVEMENT OF BYPASSED SECTIONS OF NH-12A BETWEEN KM 3/4 TO 12/6 AND KM 15/6 TO 18/8 JABALPUR AND BARELA BYPASS 12.20 KM LENGTH IN THE STATE OF MADHYA PRADESH. PWD NH
Jabalpur
54.47 Cr.
Sr. No. Project Details Authority Project Cost
1 Up-gradation to 2 lane with paved shoulders of Khawkawn (from Bridge across River Tuivai)-Ngopa Section of NH-102B of Aizawl-Imphal Economic Corridor from Existing Chainage km 0.000 to km 32.796 [Design Chainage km 0.000 to km 31.280] (Package-I) in the State of Mizoram under Bharatmala Pariyojna on EPC mode NHIDCL
New Delhi
265.60 Cr
2 Rehabilitation and Upgradation of Satana to Mangrul (Chandwad) Section of NH752 G Design Ch: Km 64.000 to Ch: Km 101.140 two lane with paved shoulder/four lane configuration in the state of Maharashtra on EPC mode PWD NH
Mumbai
220.00 Cr
3 Construction of two lanes with paved shoulders road from Tamenglong to Mahur (NH-137) in the State of Manipur starting from km 80.630 near Mandeu to km 96.870 near Jiri River (Package-6) on EPC mode NHIDCL
New Delhi
191.08 Cr
4 Construction of roads with white topping technology in Western Ahmedabad city AMC
Ahmedabad
88.44 Cr
6 Rehabilitation and upgradation of civil work pkg 25A Lateri-Shamshabad Road under Hybrid Annuity Model in the State of Madhya Pradesh MPRDC
Bhopal
73.60 Cr
7 Construction of CC roads in different mines of NCL located in M.P. with comprehensive maintenance for 5 years. NCL
New Delhi
70.92 Cr
8 Construction of 2-Lane CC Service road, RCC cover to existing drain, Bridge / culvert widening, Electrical line shifting etc. at Indore By-Pass road from Rau Circle to DPS IMC
Indore
56.79 Cr