Sr. No. | Project Details | Authority | Project Cost |
1 | Rehabilitation and Up-gradation of Kannod-Satwas-Punasa section of SH-41 from Chainage Km. 0+000 to Km. 77+330 (Design length 77+320 km) to two lane with hard shoulder road with Cement Concrete pavement in the state of MP on EPC mode. | MPRDC Bhopal |
118.68 Cr. |
2 | Up-gradation of Kusumba to Malegaon section of Principally Approved NH from Ch: 55+000 Km to Ch: 96+410 Km (Design Ch: 54+155 Km to Ch: 95+500, Total Length 41.345 KM) to Two Lane with Paved Shoulder configuration (Package No. Nashik –II Dondaicha – Kusumba – Dongrale – Malegaon Road Approx. 96.00 Km) in the State Maharashtra– PACKAGE 2 (Nashik Division) in the state of Maharashtra on EPC mode. | PWD NH Mumbai |
116.20 Cr. |
3 | Construction of 11.46 km C.C. Road in the Rewa City Portion from K.M. 229/2 TO 243/2 of old NH no 7 (MDR no 10-20) Under CRF. | MP PWD Rewa |
107.36 Cr |
4 | Construction of Bituminous Overlay Works between Km. 261+720 to Km. 379+878 in Dhule-Pimpalgaon Section of NH-3 the state of Maharashtra. | IRCON-SOMA Tollway Pvt Ltd | 86.85 Cr. |
5 | Construction of Four laning of Rau Pithampur road section from km.0.000 to km.13.826 on EPC Mode. | AKVN Indore |
75.61 Cr. |
6 | Development Work at Scheme No. 136, Indore in the state of Madhya Pradesh. | IDA Indore |
70.76 Cr. |
7 | IMPROVEMENT OF BYPASSED SECTIONS OF NH-12A BETWEEN KM 3/4 TO 12/6 AND KM 15/6 TO 18/8 JABALPUR AND BARELA BYPASS 12.20 KM LENGTH IN THE STATE OF MADHYA PRADESH. | PWD NH Jabalpur |
54.47 Cr. |
Sr. No. | Project Details | Authority | Project Cost |
1 | Up-gradation to 2 lane with paved shoulders of Khawkawn (from Bridge across River Tuivai)-Ngopa Section of NH-102B of Aizawl-Imphal Economic Corridor from Existing Chainage km 0.000 to km 32.796 [Design Chainage km 0.000 to km 31.280] (Package-I) in the State of Mizoram under Bharatmala Pariyojna on EPC mode | NHIDCL New Delhi |
265.60 Cr |
2 | Rehabilitation and Upgradation of Satana to Mangrul (Chandwad) Section of NH752 G Design Ch: Km 64.000 to Ch: Km 101.140 two lane with paved shoulder/four lane configuration in the state of Maharashtra on EPC mode | PWD NH Mumbai |
220.00 Cr |
3 | Construction of two lanes with paved shoulders road from Tamenglong to Mahur (NH-137) in the State of Manipur starting from km 80.630 near Mandeu to km 96.870 near Jiri River (Package-6) on EPC mode | NHIDCL New Delhi |
191.08 Cr |
4 | Construction of roads with white topping technology in Western Ahmedabad city | AMC Ahmedabad |
88.44 Cr |
6 | Rehabilitation and upgradation of civil work pkg 25A Lateri-Shamshabad Road under Hybrid Annuity Model in the State of Madhya Pradesh | MPRDC Bhopal |
73.60 Cr |
7 | Construction of CC roads in different mines of NCL located in M.P. with comprehensive maintenance for 5 years. | NCL New Delhi |
70.92 Cr |
8 | Construction of 2-Lane CC Service road, RCC cover to existing drain, Bridge / culvert widening, Electrical line shifting etc. at Indore By-Pass road from Rau Circle to DPS | IMC Indore |
56.79 Cr |